The objective of the Functional Testing activity in gCube is to ensure that all the components gCube services and public interfaces:

  • are conform to their specification
  • are free from erroneous or malfunction
  • can be run in the defined system requirement
  • are free from code anomalies and coding errors

The goal of functional testing is to assure the appropriate quality of the gCube software. Testing, in general, is not a procedure to find bugs, but to check that the software works in accordance with the specification, architectural and detailed design documents. In addition, the testing activity has to ensure that the software is easy to use and gives appropriate response in the case of wrong usage or defects that cannot entirely be eliminated. Testing is planned according to these goals.

The gCube software is composed by three types of components: services, libraries, and portlets. While deployment of services and libraries are tested with the Deployment tests, the functionality of portlets is tested through a specific procedure. Since portlets rely on services and libraries to perform their functions, testing the portlets functionalities implicitly tests also the functionalities of services and libraries.

Portlet Functional Testing

The Portlets composing gCube have been required to pass a functional testing procedure in order to be made available for end users. The actors involved in the procedure are: the portal manager, the infrastructure manager, and the owner (generally , portlet application domain experts or the developer of the Portlet or the responsible of the application) . The owners (portlet application domain experts) are expert users of a specific application. The owner (domain expert) knows very well all the possible interactions between the end user and the user interface. In some specific cases, they could be application developers or application owners.

The procedure starts by analysing the software artefacts included in the release along with their software dependencies. This task is carried out manually by the portal manager. Each portlet artefact which is released must be part of the functional testing procedure. Also, if anything in the dependency chain of a Portlet X is released, then X has to be functionally tested too.

The Portlets Functional Testing procedure consists of 4 stages:

  1. Web Archive check: every Portlet web archive released is verified to contain all the necessary files needed for its correct deployment. If the check is not passed the Portlet developer is notified through a new ticket of type integration issue;
  2. Back-end Service check: The portal manager and the infrastructure manager make sure that the back-end services of the Portlet application are ready and fully functional in the testing / pre-production infrastructure.
  3. Rendering check: every Portlet web archive passing stage no. 1 is then actually deployed into the pre-production portal to check if it renders correctly. In this stage there are few things that could make the Portlet not render correctly. For instance, the GWT compilation could fail during Web Archive creation, or the developer could have used some CSS classes that clash with those of the iMarine Gateway. If the check is not passed the Portlet developer is notified through a new ticket of type integration issue;
  4. Functional Test: When stage 1 and 2 and 3 are completed the functional test is assigned to the testing team which performs it by following the Software Testing Plan. An updating of the Functional test procedure is discussed to use the the Redmine tool to track the functional testing activities and dismiss the Functional Master Table. The new Software Test procedure is provided in the Functional Test (FT) Procedure section.

An online table Functional Test Master Table Template is created by the portal manager and shared with each actor involved in the functional testing procedure. Each row contains a Portlet artefact having to pass the functional testing procedure Functional Test (FT) Procedure. Below the description of the table's fields:

    • Component Name: Portlet unique identifier;
    • Owner: generally the developer of the Portlet or the responsible of the application;
    • Tester Name: name of the tester;
    • Scope: the infrastructure scope where the Portlet has to be functionally tested;
    • Web Archive validity: indicates if the software package produced by the build system can be correctly deployed in the iMarine Gateway. The portal manager compiles this part;
    • Renders OK: indicates whether the Portlet displays correctly in the iMarine Gateway. The portal manager compiles this part;
    • Service Deployed: indicates whether the infrastructure services composing the back-end of the Portlet application are ready and fully functional. The infrastructure manager compiles this part;
    • Functional Test: compiled by the tester user, indicates if the functional test was performed;
    • Link Test Plan: the general XLS portlet test plan link;
    • Ticket: the Redmine ticket associated to the functional test.

Software Testing Plan

The Software Testing Plan #1413 is created in the VRE Folders > gCube > Portlet Testing Plans containing two folders: Material and Releases.
The Material directory provides the following information:

  1. the general XLS template to be instantiated by each portlet developer for compiling the Testing Plan and
  2. the portlet folder (created by Portal Manager) for each portlet to be functionality tested. The syntax used to create the portlet folder

will be: $portlet_name_folder. Every developer will create the actual testing plan into Material/$portlet_name_folder including by adding additional files required for the test (e.g. cvs_files). To describe the functional tests, the developer will use the Portlet Testing Plan Template; this file will be pasted and completed into the Release folders by the testers. A Task (Redmine Ticket) will be assigned, by the Release Manager, to each portlet developer.
The Releases directory contains a folder for each gCube release containing the tests to be executed. The Portal Manager creates (in this directory) the gCube release directory and the portlets directories related.

Functional Test (FT) Procedure

NEW

A new procedure is released using the Redmine tool to track the testing activities. In this phase the principal role involved are : Tester Manager.

The action for the TestManager are:

  • to create the new Release Software Test Ticket (master ticket and its sub-tickets);
  • to create the query;
  • to clone the master ticket acting as template for the portlet testing.

The master ticket and its sub-tickets can be used as template with Progress filed at "0" and Status field at "New" to create the other tickets. For the testing of each release the TMAN copies from that template. In this way, only the sprint is changed (in one action thanks to the multi-selection).

The fields (for every tickets) to fill are:

  1. Project : gCube
  2. Tracker : SW Test;
  3. Subject : name of the portlets (plus version) to test or name of the Master Ticket.
    • org.gcube.subsystemName.componentName.version (SW Test) for the component test ticket. For example: org.gcube.application.aquamaps.aquamapsspeciesview.1-3-4 (SW Test).
    • gCube SW Test Release x.x.x for the Master ticket. For example gCube SW Test Release 4.3.0.
  4. Priority : Normal;
  5. Assignee: Tester, Developer, Infrastrucute or Portal Manager, Release. This assignment depend on the action to do (test, deploy, solve the issue and so on);
  6. Category : name of the subsystem portlet (e.g. portlets-admin);
  7. Sprint : Release x.x.x - FT Testing. For example: Release 4.3.0 - FT Testing;
  8. Parent Task: Master SW Test Ticket (only for the software test components ticket). The parent task for the Master Ticket is the Project Task ticket;
  9. Start Date: The date of the ticket creation;
  10. End date: Date of the deadline ;
  11. Progress: updated when the testing activities is in progress (included not only test but the solution of the issue). Only the first time the progress is 0.

Software Test Preparation

Two type of the FT test are involved:

  • for the new release portlets configuration;
  • for the old portlets configuration (the set of the portlets that in the actual release are not changed).

The statuses and workflows for the Software Test Ticket will be: At this point two different statuses and workflows are provided for the Tracker Releases and for the Software Test:

  • Tracker Releases :
New > Available > Under Integration > Build Issue (it goes back to under integration) OR RTD on Preprod > Deployed on Preprod or DT Issue (it goes back to Deployed On Preprod) > Released 
  • Tracker Software Test :
New > Available (we verify that the back-end service is up&running, if so move to next status) > Under testing (The tester tests the app) > FT Issue (it goes back Available) OR Tested on preprod.

The Tester can start with the functional test when Deployer/Infrastructure Manager updates the CRT : {status: Under Integration -> Deployed on Preprod}. The following steps are executed:

  • The Tester copies the TestPlan, with the results of the test, in the Releases directory.

For example: the tester tests the invites-friends.1-1-0 portlets. The Tester copies the TestPlan for this portlets into Releases/org.gcube.4.0.0/invites-friends.1-1-0.

  • The Tester updated the TestPlan , provided in the Releases directory, with the results for the functional testing.

For example, in the case of the invites-friends, the Tester updates the TestPlan with the functional testing results for this component.

In case the functional testing failed , the Tester opens the issue in the following way:

1) The Tester updates the CRT:{status: Deployed on Preprod -> FT Issue, comment: <issue description>}. The comment should always include a link to a relevant log/report file. The Tester updates the TestPlan provided the number of the issue ticket too (field "Link to the Issue" ) and describing the test results (fied "Results"), too.

2) After the resolution of the issue, the developer updates the CRT:{status: FT Issue -> Under Itegration, comment: <issue description>}.Now. the Infrastructure Manager can be re-deployed the service and updates the CRT status : {status: Under Integration -> Deployed on Preprod, comment: <issue description>}. The tester knows that can repeat the testing and if the test passed, updates the CRT:{status: Deployed On Preprod -> Tested on Preprod, comment: <issue description>}. Otherwise he/she repeats the step 1) (the status return in FT Issue). The Test updates the TestPlan with the new test results (field "Results"), too.

The flow is showed in the following figure:

SWTestWorkflow.png
NOTE:
 - Deployed on Preprod  indicates  that the component has been deployed on ALL nodes of preproduction and is up and running.
 - FT issue  = Functional Testing issue.
 - Tested on Preprod : indicated that the developer and/or the portal manager or the preprod infrastructure manager 
   are confident that the component behave as expected and can be released as is.

The pre-production infrastructure is provided for the functional testing hosted at CNR. The Release Manager askes to every partners to suggest the persons that forms the testing team. The following recommendations is mandatory:

  1. The effort should be based not per application but per number of tests to be executed [1].
  2. The tester should not be the same owner of the portlet[2].
  3. For every release a wiki page is created: $functional_test_master_table_Org_gCube_#Release. For example for the release org.gcube.4.0.0 has been create the following Functional Test Master Table gCube Release 4.0.0 wiki page. The Functional Test Master Table Template is filled by the testers with the FT results for the portlets applications in the pre-production infrastructure.

TO COMPLETE

Functional Test (FT) Master Table List - TO REMOVE

This section provides the list of the Functional_Master_Table performed for every release.

Roles

The functionality testing activity foresees the involvement of the following roles:

  • Tester
  • Developer

Tester

The details about the role of the testers are hosted on the Testers wiki page.
The Tester is responsible:

The tester starts with the functional test when Deployer/Infrastructure Manager updates the CRT status: {status: Under Integration -> Deployed on Preprod}. In case the functional testing fails , the Tester opens the issue updating the CRT: {status: Deployed on Preprod -> FT Issue, comment: <issue description>}.
The comment should always include a link to a relevant log/report file.
After the resolution of the issue, the developer updates the CRT in Under Integration . The Infrastructure Manager know that the portlets must be re-deployed (and after the deploy on Preprod the Tester can repeat the test): {status: FT Issue -> Under Integration, comment: <issue description>}.
The Tester repeats the testing and, if the test not fails, updates the CRT: {status: FT Issue -> Tested on Preprod, comment: <issue description>}. Otherwise reopen the issue and the track status return in FT Issue.

Developer

The details about the role of the developers are hosted on Developers wiki page. The developer is:

Infrastructure

The execution of functionality tests requires a gCube testing infrastructure fully functional. A detailed description of the testing infrastructure can be found Testing Infrastructure