Difference between revisions of "Software Integration and Distribution: Procedures"
From Gcube Wiki
Luca.frosini (Talk | contribs) (→Testing Plan) |
Luca.frosini (Talk | contribs) (→Release Procedures) |
||
Line 10: | Line 10: | ||
* [[Documentation Writing guidelines|Documentation Writing guidelines]] | * [[Documentation Writing guidelines|Documentation Writing guidelines]] | ||
** [[Changelog Generation procedure|Changelog Generation procedure]] | ** [[Changelog Generation procedure|Changelog Generation procedure]] | ||
− | |||
* [[Distribution procedure|Distribution procedure]] | * [[Distribution procedure|Distribution procedure]] | ||
Revision as of 16:38, 3 September 2015
Release Procedures
A number of procedures have been defined to accomplish different tasks concerning the integration, documentation and distribution of gCube System releases. In this section we describes in details the most important procedures with all the steps and responsibilities of each role.
Table of Content for this section:
- Continuous Integration
- Major/Minor Release Cycle
- Maintenance Release Cycle
- Documentation Writing guidelines
- Distribution procedure
Testing Plan
This section collects all testing methodologies and technologies used in gCube project to test different aspects of its components.
For detailed information about each type of test, please see subsections: