Verifying the Virtual Organization correctness

From Gcube Wiki
Revision as of 00:24, 3 December 2009 by Manuele.simi (Talk | contribs) (New page: If a VO is properly installed and configured, all the following conditions must be verified: # in the IS Monitoring #* a new entry in the top-left menu with the VO Scope name is available...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

If a VO is properly installed and configured, all the following conditions must be verified:

  1. in the IS Monitoring
    • a new entry in the top-left menu with the VO Scope name is available
    • by selecting the entry and then the gHN Resource Type, all the gHNs joined to the VO must be in the Certified status
    • by selecting the entry and then the Running Instance Resource Type, all the instances belonging the VO must be in the Ready status