Difference between revisions of "GCube Integration and Interoperability Facilities Development"

From Gcube Wiki
Jump to: navigation, search
m
m
Line 6: Line 6:
 
The goal of this activity is to ...
 
The goal of this activity is to ...
  
A specific methodology has been defined to drive the whole activity ('''[[gCube Integration and Interoperability Facilities Development Methodology | Methodology]]''').
+
A specific methodology has been defined to drive the whole activity ('''[[gCube Integration and Interoperability Facilities Development Methodology|Methodology]]''').
  
 
Such methodology is based on a number of '''[[gCube Integration and Interoperability Working Groups|Working Groups]]'''.
 
Such methodology is based on a number of '''[[gCube Integration and Interoperability Working Groups|Working Groups]]'''.

Revision as of 18:40, 10 April 2012

The goal of this activity is to ...

A specific methodology has been defined to drive the whole activity (Methodology).

Such methodology is based on a number of Working Groups.


Meeting Minutes

Activity Reports