Difference between revisions of "Release Integration"

From Gcube Wiki
Jump to: navigation, search
(Release Preparation)
(Release Preparation)
Line 20: Line 20:
  
 
Once the preparation steps are completed, the integration phase can be started.
 
Once the preparation steps are completed, the integration phase can be started.
 +
 +
*After the integration phase, the component master branch must be freezed until the release will be declared closed by Release Manager.

Revision as of 08:46, 19 June 2020

Preliminary steps

  • Upgrade and test the component in development environment
  • Deploy the SNAPSHOT version on gcube-snapshots repository
  • Add the maven-parent 1.1.0 to the component pom



Release Preparation

In order to integrate a new component in a gCube release, some preparatory steps (performed by the Developer) are needed:

Once the preparation steps are completed, the integration phase can be started.

  • After the integration phase, the component master branch must be freezed until the release will be declared closed by Release Manager.