Difference between revisions of "DJRA1.1 Report on Knowledge Ecosystem Supporting Technology Development"

From Gcube Wiki
Jump to: navigation, search
(Development Version)
(Code Metrics)
Line 57: Line 57:
  
 
== Code Metrics ==
 
== Code Metrics ==
''This section will describe and link the [https://networking.wiki.d4science-ii.research-infrastructures.eu/networking/index.php/QATF_Indicators#JRA_gCube_Development JRA Indicators]''
+
''This section will describe and link the [https://networking.wiki.d4science-ii.research-infrastructures.eu/networking/index.php/QATF_Indicators#JRA_gCube_Development JRA Indicators]'' (login is required)
  
 
[TBC]
 
[TBC]

Revision as of 03:34, 12 July 2010


Introduction

The goals of the work package JRA1 Knowledge Ecosystem Implementation are to provide the technology realising the common practices, standards and solutions identified by the NA4 work package and enhance and consolidate the gCube system to match the needs of the ecosystem approach. A primary role of JRA1 (played within TJRA1.2) is to address the various interoperability issues inherent in the construction of a knowledge ecosystem, and then identify and implement proper solutions. Ranging from content-related problems to architecture-oriented issues. Major inputs for this part of the work come from DNA4.1.

An Agilish development methodology (referring to no specific Agile development platforms, but to the general idea of quickly responding to change) is driving the teams in JRA1. Plans are sketched and verified with the management boards and user communities; seeing and playing with the system being the most important thing and is preferred to over-planning.

This deliverable documents the gCube technology by reporting on the overall status of the system architecture, the per service tasks and enhancements, and other technical details needed to have a comprehensive understanding of the developed knowledge ecosystem enabling technology.

The deliverable is implemented through a Wiki page to be easily and promptly adapted to reflect the ever-evolving status of the developed technologies. For the same reasons, performed and planned activities are reported via dedicated TRAC reports, created for this very purpose.

State of Software Development Activities

This section reports on the current maintenance and upgrade activities performed and to be performed on the gCube system.

Traditional approaches to planning have proved to do not fit Agile methodology. The fast moving forward of the software makes obsolete every plan very quickly and huge documentation should be continuously updated with a considerable waste of effort. The innovative approach followed by D4ScienceII is based upon a proper exploitation of the project's TRAC instance:

  • firstly, four dedicated milestones were defined:
  • Short-Term gCube plan, used when the activities described in a ticket are planned to be completed within the next month;
  • Medium-Term gCube plan , used when the activities described in a ticket are planned to be completed within the next 3 months;
  • Long-Term gCube plan, , used when the activities described in a ticket do not have a starting and ending date yet;
  • Ready To Release, used when the activities described in a ticket are completed and passed to SA.
The idea behind these milestones is that a developer moves his/her tickets among them according to the work performed or to be performed on each ticket;
  • then, JRA1 management asked to each developer to insert his/her own tasks and give an estimation of delivery by assigning one of the milestones above;
  • finally, in order to stand over the activities, four TRAC's living reports have been created for this purpose. These reports are introduced in the following sub-sections.

This flexible strategy gives the opportunity to have a living picture of the continuous evolution of the system. The reports are automatically updated each time a change occurs in a ticket or whenever a new ticket is submitted.

Upgrade Activities

Upgrade activities refer to tasks and enhancements that lead to future releases of the gCube technology:

→ the planned actions are recorded in report #37
→ the closed actions are recorded in report #38

Maintenance Activities

Maintenance activities are dedicated to fix defects found in the technology delivered so far and the related documentation:

→ the open maintenance activities are recorded in report #39
→ the closed maintenance activities are recorded in report #40


In addition to the development activities captured by the reports above, other stems from incidents and malfunctions discovered while exploiting the technology in the production infrastructure. They are captured by two specific living reports, current incidents (Report #9) and resolved incidents (Report #11). Yet, these reports include both JRA1 and JRA2 incidents.

Code Metrics

This section will describe and link the JRA Indicators (login is required)

[TBC]

Code Statistics

D4ScienceII uses StatSVN to retrieve information from the project source code repository and to generate statistics describing the project development. The project source code repository consists of two separated subversion instances: one instance is dedicated to the gCube components, while the other one is specific for the gCore development stream.

Both of them are operative since March 2008, thus the produced data documents the evolution of the software from such period on.

The following reports, tables and charts describe the project development.

gCube gCore
Timeline for the Lines of Code (LOC) Timeline for the Lines of Code (LOC)
Lines of Code per Developer Lines of Code per Developer
LOC Evolution and Changes per Day LOC Evolution and Changes per Day
Software Repository Hierarchical View Software Repository Hierarchical View

Documentation

The software delivered is properly documented by the Development and Administrator's Guides. These two guides represent the main source of information for everyone that has to technically deal with the gCube system and they run deeply at components level.

  • developers aiming at producing software that interacts with a gCube components
  • developers that take over a component from another one and start a new development stream
  • Administrator's Guide: this guide is mainly written to provide support to Site Managers for installing and deploying gCube nodes and components. However, it can be used by developers to have local instances of the components they interact with.

Software

Development Version

D4ScienceII relies on the ETICS system to automate the building and testing phases of the software. In particular, the project has put in place mechanisms to perform daily builds of the latest version of the code committed in the project source code repository. This activity leads to the production of (i) a report of the build activity and (ii) a set of software artifacts including the software package, the source code and the documentation.

JRA1 is responsible for managing the development version (namely HEAD) of these reports and artifacts whose main purpose is to provide a way to

  • verify the dependencies among the artifacts
  • exchange artifacts among the development teams


gCube gCore
Build Report Build Report
Development Version (Login is required) Latest Version (Login is required)